SEMI International Standards
Standards Locale: North America
Committee: Facilities & Gases
Place of Meeting: San Francisco Marriott Marquis
Date of Meeting: 07/12/2016
Meeting End Date: 07/12/2016
Recording SEMI Standards Staff: Laura Nguyen
CER Posted to Web: 07/28/2016


Leadership Changes

Group
Previous Leader
New Leader
Gases Specifications Task ForceOpenThomas Fritz (WIKA)
Matt Milburn (UCT)
Power Grid Harmonics Task ForceNew Task Force in the Facilities TC ChapterAlex McEachern (Power Standards Lab)


Committee Structure Changes
None.

Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting.
Document #
Document Title
Committee Action
A&R Forms for Approved Ballots
3440CNew Standard: Test Method for Pressure Transducers in Gas Delivery SystemsPassed, Ratification Ballot to be issued3440CProceduralReview.docx3440CProceduralReview.docx
5997Line Item Revision to SEMI C3-0413, Specifications for Gases
Line Item 1Correct the title of this Standard from “Specifications for Gases” to “Specification for Gases”Failed, returned to the TF for re-work and re-ballot in Cycle 7
5998Line Item Revision to SEMI C54-1103 (Reapproved 0211), Specifications and Guidelines for Oxygen5998ProceduralReview.pdf5998ProceduralReview.pdf
Line Item 1Correct the title of this Standard from “Specifications and Guidelines for Oxygen” to “Specification for Oxygen”Passed, Super clean
5999Line Item Revision to SEMI C56-0305 (Reapproved 0211), Specifications and Guidelines for Dichlorosilane (SiH2Cl2)5999ProceduralReview.pdf5999ProceduralReview.pdf
Line Item 1Correct the title of this Standard from “Specifications and Guidelines for Dichlorosilane (SiH2Cl2)” to “Specification for Dichlorosilane”Passed, Super clean
6000Line Item Revision to SEMI C57-0305 (Reapproved 0211), Specifications and Guidelines for Argon
Line Item 1Correct the title of this Standard from “Specifications and Guidelines for Argon” to “Specification and Guide for Argon”Failed, returned to the TF for re-work and re-ballot in Cycle 7
6001Line Item Revision to SEMI C58-1213, Specifications for Hydrogen6001ProceduralReview.pdf6001ProceduralReview.pdf
Line Item 1Correct the title of this Standard from “Specifications for Hydrogen” to “Specification for Hydrogen”Passed, Super clean
6002Line Item Revision to SEMI C59-1104 (Reapproved 0211), Specifications and Guidelines for Nitrogen
Line Item 1Correct the title of this Standard from “Specifications and Guidelines for Nitrogen” to “Specification and Guide for Nitrogen”Failed, returned to the TF for re-work and re-ballot in Cycle 7
6003Line Item Revision to SEMI C60-0305 (Reapproved 0211), Specifications and Guidelines for Nitrous Oxide (N2O)
Line Item 1Correct the title of this Standard from “Specifications and Guidelines for Nitrous Oxide (N2O)” to “Specification and Guide for Nitrous Oxide”Failed, returned to the TF for re-work and re-ballot in Cycle 7
6004Line Item Revision to SEMI C70-0611, Specifications for Tungsten Hexafluoride (WF6)6004ProceduralReview.pdf6004ProceduralReview.pdf
Line Item 1Correct the title of this Standard from “Specifications for Tungsten Hexafluoride (WF6)” to “Specification for Tungsten Hexafluoride”Passed, Super clean
5244BRevision of SEMI F21-1102, Classification of Airborne Molecular Contaminant Levels in Clean EnvironmentsPassed, as balloted5244BProceduralReview.pdf5244BProceduralReview.pdf
5963ALine Item Revision To Semi F62-0701 (Reapproved 1111) Test Method For Determining Mass Flow Controller Performance Characterisitics From Ambient And Gas Temperature Effects5963AProceduralReview.pdf5963AProceduralReview.pdf
Line Item 1Modify terminology in Section 5.1Passed, with editorial changes
Line Item 2Modify Section 15.1 as shownPassed, Super clean
5964ALine Item Revision To Semi E56-0815 Test Method For Determining Accuracy, Linearity, Repeatability, Short-Term Reproducibility, Hysteresis, And Dead Band Of Thermal Mass Flow Controllers
Line Item 1Modify terminology in Section 5.1Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 2Change to Formula 1Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 3Change to Formula 2Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 4Change to Formula 5Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 5Change to Formula 6Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 6Change to Formula 8Failed, returned to the TF for re-work and re-ballot in Cycle 7
Line Item 7Change to Formula 16Failed, returned to the TF for re-work and re-ballot in Cycle 7
5155New Standard, Guide for Facilities Data Package for Semiconductor Equipment InstallationFailed, returned to the TF for re-work and re-ballot in Cycle 7


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities

#
Type
SC/TF/WG
Details
R3440CRat. BallotPressure Measurement TFNew Standard: Test Method for Pressure Transducers in Gas Delivery Systems - 3440C passed committee review with a Ratification Ballot to be issued for Cycle 6-16
5816BSNARFFilters & Purifiers TFRevision to SEMI F30-0710: Start-Up and Verification of Purifier Performance Testing for Trace Gas Impurities and Particles at an Installation Site – SNARF was revised, completed two-week member review, and was approved to ballot for Cycle 6-16
6059SNARFFilters & Purifiers TFSEMI F29-0997 (Reapproved 0611): Test Method for Purge Efficacy of Gas Source System Panels – Due for Five-Year Review
6060SNARFFilters & Purifiers TFSEMI F70-0611: Test Method for Determination of Particle Contribution of Gas Delivery System – Due for Five-Year Review
6050SNARFMass Flow Controller TFSEMI E16-0611: Guideline for Determining and Describing Mass Flow Controller Leak Rates – Due for Five-Year Review, Line item revision to correct the nonconforming title
6054SNARFMass Flow Controller TFSEMI E18-0211: Guide for Temperature Specifications of the Mass Flow Controller – Due for Five-Year Review
6055SNARFMass Flow Controller TFSEMI E27-0611: Standard for Mass Flow Controller and Mass Flow Meter Linearity – Due for Five-Year Review, Line item revision to correct the nonconforming title
6056SNARFMass Flow Controller TFSEMI E28-1110: Guide for Pressure Specifications of the Mass Flow Controller – Due for Five-Year Review
6057SNARFMass Flow Controller TFSEMI E29-1110: Terminology for the Calibration of Mass Flow Controllers and Mass Flow Meters – Due for Five-Year Review
6058SNARFMass Flow Controller TFSEMI E66-0611: Test Method for Determining Particle Contribution by Mass Flow Controllers – Due for Five-Year Review
5997ASNARFGases Specifications TFLine Item Revision to SEMI C3-0413, Specifications for Gases – SNARF to be revised, distributed for two-week TC member review followed by GCS and re-ballot for Cycle 7-16.
6000ASNARFGases Specifications TFLine Item Revision to SEMI C57-0305 (Reapproved 0211), Specifications and Guidelines for Argon – SNARF to be revised, distributed for two-week TC member review followed by GCS and re-ballot for Cycle 7-16.
6002ASNARFGases Specifications TFLine Item Revision to SEMI C59-1104 (Reapproved 0211), Specifications and Guidelines for Nitrogen – SNARF to be revised, distributed for two-week TC member review followed by GCS and re-ballot for Cycle 7-16.
6003ASNARFGases Specifications TFLine Item Revision to SEMI C60-0305 (Reapproved 0211), Specifications and Guidelines for Nitrous Oxide (N2O) – SNARF to be revised, distributed for two-week TC member review followed by GCS and re-ballot for Cycle 7-16.
TFOFPower Grid Harmonics TFApproval of new Task Force on 07/12/2016
6037SNARFPower Grid Harmonics TFNew Standard: Specification for Power Grid Harmonics Compatibility
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF

Authorized Ballots

#
When
SC/TF/WG
Details
R3440CCycle 6, 2016Pressure Measurement TFRatification Ballot for New Standard: Test Method for Pressure Transducers in Gas Delivery Systems
5816BCycle 6, 2016Filters & Purifiers TFRevision to SEMI F30-0710: Start-Up and Verification of Purifier Performance Testing for Trace Gas Impurities and Particles at an Installation Site
6060Cycle 6, 2016Filters & Purifiers TFReapproval of SEMI F70-0611 – Test Method for Determination of Particle Contribution of Gas Delivery System
6059Cycle 6, 2016Filters & Purifiers TFReapproval of SEMI F29-0997 (Reapproved 0611) – Test Method for Purge Efficacy of Gas Source System Panels
6050Cycle 6, 2016Mass Flow Controller TFLine Item Revision to Correct the Title of SEMI E16-0611: Guideline for Determining and Describing Mass Flow Controller Leak Rates
6054Cycle 6, 2016Mass Flow Controller TFReapproval of SEMI E18-0211: Guide for Temperature Specifications of the Mass Flow Controller
6055Cycle 6, 2016Mass Flow Controller TFReapproval of SEMI E27-0611: Guide for Mass Flow Controller and Mass Flow Meter Linearity
6056Cycle 6, 2016Mass Flow Controller TFReapproval of SEMI E28-1110: Guide for Pressure Specifications of the Mass Flow Controller
6057Cycle 6, 2016Mass Flow Controller TFReapproval of SEMI E29-1110: Terminology for the Calibration of Mass Flow Controllers and Mass Flow Meters
6058Cycle 6, 2016Mass Flow Controller TFReapproval of SEMI E66-0611: Test Method for Determining Particle Contribution by Mass Flow Controllers
5964BCycle 6 or 7, 2016Mass Flow Controller TFLine Item Revision To Semi E56-0815 Test Method For Determining Accuracy, Linearity, Repeatability, Short-Term Reproducibility, Hysteresis, And Dead Band Of Thermal Mass Flow Controllers
5997ACycle 7, 2016Gases Specifications TFLine Item Revision to SEMI C3-0413, Specifications for Gases – SNARF to be revised, sent out for two-week member review followed by GCS and re-ballot for Cycle 7-16.
6000ACycle 7, 2016Gases Specifications TFLine Item Revision to SEMI C57-0305 (Reapproved 0211), Specifications and Guidelines for Argon – SNARF to be revised, sent out for two-week member review followed by GCS and re-ballot for Cycle 7-16.
6002ACycle 7, 2016Gases Specifications TFLine Item Revision to SEMI C59-1104 (Reapproved 0211), Specifications and Guidelines for Nitrogen – SNARF to be revised, sent out for two-week member review followed by GCS and re-ballot for Cycle 7-16.
6003ACycle 7, 2016Gases Specifications TFLine Item Revision to SEMI C60-0305 (Reapproved 0211), Specifications and Guidelines for Nitrous Oxide (N2O) – SNARF to be revised, sent out for two-week member review followed by GCS and re-ballot for Cycle 7-16.
5155ACycle 7, 2016BIM TFNew Standard, Guide for Facilities Data Package for Semiconductor Equipment Installation


SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
None.

Next Meeting
The next meeting of the Joint Facilities & Gases NA TC Chapter committee is scheduled for Tuesday, November 8, 2016 at the NA Standards Fall 2016 Meetings at SEMI Headquarters.
For more information, please visit: http://www.semi.org/en/standards