SEMI International Standards
Standards Locale: North America |
Committee: EHS |
Place of Meeting: SEMI Headquarters in San Jose, California |
Date of Meeting: 04/03/2014 |
Meeting End Date: 04/03/2014 |
|
Recording SEMI Standards Staff: Paul Trio |
CER Posted to Web: 04/17/2014 |
Leadership Changes
Group | Previous Leader | New Leader |
S2 Fail-Safe Fault-Tolerant Task Force has been disbanded. | Chris Evanston (Salus) and Lauren Crane (KLA-Tencor) stepped down. | |
Fire Protection Task Force | | Eric Sklar (Safety Guru, LLC) has been appointed as new TF co-leader serving with Matt Wyman (Koetter Fire Protection) |
Committee Structure Changes
None.
Ballot Results
None.
Ratification Ballot Results
None.
Activities Approved by the GCS between meetings of TC Chapter meeting
None.
Authorized Activities
Listing of all new TFOFs, SNARFs, and other activities approved by the committee.
# | Type | SC/TF/WG | Details |
5718 | SNARF | S10 TF | Revision to SEMI S10, Safety Guideline for Risk Assessment and Risk Evaluation Process.
Line items changes to SEMI S10 to solve some clarification issues and update to latest standards (ISO 12100). This revision will not affect the Risk Ranking tables of Appendix 1. These will be done as a separate effort. |
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF
Authorized Ballots
Listing of documents approved by the committee for letter ballot.
# | When | SC/TF/WG | Details |
4449E | Cycle 3, 2014
(or C4-14) | S2 Ladders & Steps TF | Delayed Line Item Revision to SEMI S2-0712, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment.
Line Item Revisions related to Work at Elevated Locations and Design Criteria for Platforms, Steps, and Ladders |
4683C | Cycle 3, 2014
(or C4-14) | S2 Chemical Exposure TF | Line Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions related to Chemical Exposure |
5591 | Cycle 3, 2014
(or C4-14) | Fire Protection TF | Line Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revision related to Fire Protection |
5625 | Cycle 3, 2014
(or C4-14) | S2 Non-ionizing Radiation TF | Line Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions related to Non-Ionizing Radiation |
4316K | Cycle 3, 2014
(or C4-14) | S22 TF | Line Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment, and SEMI S22, Safety Guideline for the Electrical Design of Semiconductor Manufacturing Equipment
Delayed Revision related to Programmable Safety Circuits |
5649A | Cycle 3, 2014
(or C4-14) | S22 TF | Delayed Line Item Revisions to SEMI S22, Safety Guideline for the Electrical Design of Semiconductor Manufacturing EquipmentI
Alignment with IEC 60204-33 and provide the additional flexibility that is allowed in that document |
5009C | Cycle 3, 2014
(or C4-14) | S8 Ergonomics TF | Line Item Revisions to SEMI S8-0712, Safety Guidelines for Ergonomics Engineering of Semiconductor Manufacturing Equipment.
Delayed Revisions on multiple topics |
5718 | Cycle 3, 2014
(or C4-14) | S10 TF | Revision to SEMI S10, Safety Guideline for Risk Assessment and Risk Evaluation Process.
Line items changes to SEMI S10 to solve some clarification issues and update to latest standards (ISO 12100). This revision will not affect the Risk Ranking tables of Appendix 1. These will be done as a separate effort. |
SNARF(s) Granted a One-Year Extension
None.
SNARF(s) Cancelled
None.
Standard(s) to receive Inactive Status
None.
Special Announcements of the Committee (Workshops, Programs, etc.)
Reapproval Ballots for SEMI S5 and S27 to be issued in Cycle 8, 2014 Voting Period
The North America EHS Committee plans to submit reapproval ballots for the SEMI S5 (Safety Guideline for Sizing and Identifying Flow Limiting Devices for Gas Cylinder Valves) and S27 (Safety Guideline for the Contents of Environmental, Safety, and Health (ESH) Evaluation Reports) Safety Guidelines, which will soon be due for 5-year review, for the first available cycle after the NA Standards Fall 2014 meetings (Cycle 8, 2014)
Next Meeting
North America Standards Meetings at SEMICON West 2014
July 7-10, 2014
San Francisco Marriott Marquis Hotel
780 Mission Street
San Francisco, California 94103
U.S.A.
Monday, July 7
- S22 (Electrical Safety) TF (9:00 AM to 10:30 AM)
- Hazardous Energy Control Isolation Devices TF (10:30 AM to 12:00 Noon)
- S2 Non-Ionizing Radiation TF (1:00 PM to 2:00 PM)
- S2 Chemical Exposure TF (2:00 PM to 3:30 PM)
- S6 Revision TF (3:30 PM to 5:00 PM)
- NA Seismic Liaison TF (5:00 PM to 6:00 PM)
Tuesday, July 8
- Fire Protection TF (9:00 AM to 10:30 AM)
- S10 TF (10:30 AM to 12:00 Noon)
- S7 Revision TF (1:00 PM to 2:00 PM)
- S1 Revision TF (2:00 PM to 3:30 PM)
- S8 Ergonomics TF (3:30 PM to 5:00 PM)
- S23 Revision Japan TF (5:00 PM to 6:00 PM)
Wednesday, July 9
- [International Compliance and Regulatory Committee (ICRC) (8:00 AM to 11:00 AM)]
- EHS Leadership Meeting (11:00 AM to 12:00 Noon)
- S2 Machinery Directive Mapping TF (1:00 PM to 2:00 PM)
- Manufacturing Equipment Safety Subcommittee [MESSC] (2:00 PM to 4:00 PM)
- S2 Ladders & Steps TF (4:00 PM to 5:30 PM)
Thursday, July 10
- EHS Committee (9:00 AM to 6:00 PM)
For more information, please visit: http://www.semi.org/en/node/49446
For more information about SEMICON West 2014, please visit: http://www.semiconwest.org
Copyright ©2024 Semiconductor Equipment and Materials International (SEMI®). All rights reserved.
|