Leadership Changes

Group
Previous Leader
New Leader
S2 Fail-Safe Fault-Tolerant Task Force has been disbanded.Chris Evanston (Salus) and Lauren Crane (KLA-Tencor) stepped down.
Fire Protection Task ForceEric Sklar (Safety Guru, LLC) has been appointed as new TF co-leader serving with Matt Wyman (Koetter Fire Protection)


Committee Structure Changes
None.

Ballot Results
None.

Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities
Listing of all new TFOFs, SNARFs, and other activities approved by the committee.
#
Type
SC/TF/WG
Details
5718SNARFS10 TFRevision to SEMI S10, Safety Guideline for Risk Assessment and Risk Evaluation Process.
Line items changes to SEMI S10 to solve some clarification issues and update to latest standards (ISO 12100). This revision will not affect the Risk Ranking tables of Appendix 1. These will be done as a separate effort.
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF

Authorized Ballots
Listing of documents approved by the committee for letter ballot.
#
When
SC/TF/WG
Details
4449ECycle 3, 2014
(or C4-14)
S2 Ladders & Steps TFDelayed Line Item Revision to SEMI S2-0712, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment.
Line Item Revisions related to Work at Elevated Locations and Design Criteria for Platforms, Steps, and Ladders
4683CCycle 3, 2014
(or C4-14)
S2 Chemical Exposure TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions related to Chemical Exposure
5591Cycle 3, 2014
(or C4-14)
Fire Protection TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revision related to Fire Protection
5625Cycle 3, 2014
(or C4-14)
S2 Non-ionizing Radiation TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions related to Non-Ionizing Radiation
4316KCycle 3, 2014
(or C4-14)
S22 TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment, and SEMI S22, Safety Guideline for the Electrical Design of Semiconductor Manufacturing Equipment
Delayed Revision related to Programmable Safety Circuits
5649ACycle 3, 2014
(or C4-14)
S22 TFDelayed Line Item Revisions to SEMI S22, Safety Guideline for the Electrical Design of Semiconductor Manufacturing EquipmentI
Alignment with IEC 60204-33 and provide the additional flexibility that is allowed in that document
5009CCycle 3, 2014
(or C4-14)
S8 Ergonomics TFLine Item Revisions to SEMI S8-0712, Safety Guidelines for Ergonomics Engineering of Semiconductor Manufacturing Equipment.
Delayed Revisions on multiple topics
5718Cycle 3, 2014
(or C4-14)
S10 TFRevision to SEMI S10, Safety Guideline for Risk Assessment and Risk Evaluation Process.
Line items changes to SEMI S10 to solve some clarification issues and update to latest standards (ISO 12100). This revision will not affect the Risk Ranking tables of Appendix 1. These will be done as a separate effort.


SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
Reapproval Ballots for SEMI S5 and S27 to be issued in Cycle 8, 2014 Voting Period
The North America EHS Committee plans to submit reapproval ballots for the SEMI S5 (Safety Guideline for Sizing and Identifying Flow Limiting Devices for Gas Cylinder Valves) and S27 (Safety Guideline for the Contents of Environmental, Safety, and Health (ESH) Evaluation Reports) Safety Guidelines, which will soon be due for 5-year review, for the first available cycle after the NA Standards Fall 2014 meetings (Cycle 8, 2014)

Next Meeting
North America Standards Meetings at SEMICON West 2014
July 7-10, 2014
San Francisco Marriott Marquis Hotel
780 Mission Street
San Francisco, California 94103
U.S.A.

Monday, July 7
- S22 (Electrical Safety) TF (9:00 AM to 10:30 AM)
- Hazardous Energy Control Isolation Devices TF (10:30 AM to 12:00 Noon)
- S2 Non-Ionizing Radiation TF (1:00 PM to 2:00 PM)
- S2 Chemical Exposure TF (2:00 PM to 3:30 PM)
- S6 Revision TF (3:30 PM to 5:00 PM)
- NA Seismic Liaison TF (5:00 PM to 6:00 PM)

Tuesday, July 8
- Fire Protection TF (9:00 AM to 10:30 AM)
- S10 TF (10:30 AM to 12:00 Noon)
- S7 Revision TF (1:00 PM to 2:00 PM)
- S1 Revision TF (2:00 PM to 3:30 PM)
- S8 Ergonomics TF (3:30 PM to 5:00 PM)
- S23 Revision Japan TF (5:00 PM to 6:00 PM)

Wednesday, July 9
- [International Compliance and Regulatory Committee (ICRC) (8:00 AM to 11:00 AM)]
- EHS Leadership Meeting (11:00 AM to 12:00 Noon)
- S2 Machinery Directive Mapping TF (1:00 PM to 2:00 PM)
- Manufacturing Equipment Safety Subcommittee [MESSC] (2:00 PM to 4:00 PM)
- S2 Ladders & Steps TF (4:00 PM to 5:30 PM)

Thursday, July 10