SEMI International Standards
Standards Locale: North America |
Committee: Physical Interfaces & Carriers |
Place of Meeting: San Francisco Marriott in San Francisco, California |
Date of Meeting: 07/15/2015 |
Meeting End Date: 07/15/2015 |
|
Recording SEMI Standards Staff: David Bouldin |
CER Posted to Web: 07/28/2015 |
Leadership Changes
None.
Committee Structure Changes
None.
Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for rework and reballoting.
Ratification Ballot Results
None.
Activities Approved by the GCS between meetings of TC Chapter meeting
None.
Authorized Activities
None.
Authorized Ballots
None.
SNARF(s) Granted a One-Year Extension
None.
SNARF(s) Cancelled
None.
Standard(s) to receive Inactive Status
None.
Special Announcements of the Committee (Workshops, Programs, etc.)
International Reticle SMIF Pod and Load Port Interoperability TF Activity
At the North America NA PIC TC Chapter meeting held July 15, in conjunction with the NA Standards SEMICON West 2015 Meetings, they approved the creation of a new SNARF to revise E111 with references to the change added to E19, E112, and E117. Since the SNARF had not been issued for TC Member review in accordance with § 8.2.1 of the SEMI Standards Regulations, it will be sent for TC Member review, a request to the GCS for final approval of the SNARF, and a request to the GCS to approve a Letter Ballot for Cycle 7. Note that the TF wants to ballot adding this new Related Information section rather than authorizing publication as unballoted additions.
Next Meeting
Fall NA Standards Meetings
November 2-5, 2015
Location (Tentative)
SEMI Headquarters or Intel (Robert Noyce Building)
3081 Zanker Road 2200 Mission College Blvd
San Jose, CA 95134 Santa Clara, CA 95054
U.S.A. U.S.A.
Wednesday, November 3 (Tentative)
- International Reticle SMIF Pod and Load Port Interoperability TF (8:00 AM to 9:00 AM)
- Global PIC Maintenance TF (9:00 AM to 10:00 AM)
- Joint Int'l 450 mm PIC/Int'l Process Module Physical Interface TFs (10:00 AM to 11:00 AM)
- NA 450mm Shipping Box TF (1:00 PM to 2:00 PM)
- Physical Interfaces and Carriers TC Chapter (2:00 PM to 5:00 PM)
Copyright ©2024 Semiconductor Equipment and Materials International (SEMI®). All rights reserved.