Leadership Changes

Group
Previous Leader
New Leader
Gases Specification Task ForceMohamed Saleem (Acting TF Leader), Matt Milburn (UCT)Thomas Fritz (WIKA Instruments)
Pressure Measurement Task ForceYanli Joyce Chen (UCT)
Jeff Christian (WIKA Instruments)
The Committee has moved this Task Force to Inactive Status.


Committee Structure Changes
None.

Ballot Results

Document #
Document Title
Committee Action
A&R Forms for Approved Ballots
5816BRevision to SEMI F30-0710: Start-Up and Verification of Purifier Performance Testing for Trace Gas Impurities and Particles at an Installation Site
Passed, Ratification Ballot to be issued
5816BProceduralReview.pdf5816BProceduralReview.pdf
5964BLine Item Revision to SEMI E56-0314, Test Method for Determining Accuracy, Linearity, Repeatability, Short-Term Reproducibility, Hysteresis, and Dead Band of Thermal Mass Flow Controllers5964BProceduralReview.pdf5964BProceduralReview.pdf
Line Item 1Modifications to Section 5
Passed, with editorial changes
Line Item 2Change to Formula 1
Passed, Superclean
Line Item 3Change to Formula 2
Passed, Superclean
Line Item 4Change to Formula 5
Passed, Superclean
Line Item 5Change to Formula 6
Passed, Superclean
Line Item 6Change to Formula 8
Passed, Superclean
Line Item 7Change to Formula 16
Passed, Superclean
5997ARevision to SEMI C3-0413, Specifications for Gases
Passed, Ratification Ballot to be issued
5997AProceduralReview.pdf5997AProceduralReview.pdf
6000ARevision to SEMI C57-0305 (Reapproved 0211), Specifications and Guidelines for Argon
Passed, as balloted
6000AProceduralReview.pdf6000AProceduralReview.pdf
6002ARevision to SEMI C59-1104 (Reapproved 0211), Specifications and Guidelines for Nitrogen
Passed, as balloted
6002AProceduralReview.pdf6002AProceduralReview.pdf
6003ARevision to SEMI C60-0305 (Reapproved 0211), Specifications and Guidelines for Nitrous Oxide (N2O)
Passed, as balloted
6003AProceduralReview.pdf6003AProceduralReview.pdf
6050Line Item Revision to Modify the Nonconforming Title for SEMI E16-0611, Guideline for Determining and Describing Mass Flow Controller Leak Rates6050 ProceduralReview.pdf6050 ProceduralReview.pdf
Line Item 1Correct the title of SEMI E16 from “Guideline for Determining and Describing Mass Flow Controller Leak Rates” to “Guide for Determining and Describing Mass Flow Controller Leak Rates”
Passed, Superclean
6054Reapproval of SEMI E18-0211, Guide for Temperature Specifications of the Mass Flow Controller
Failed, returned to the TF for rework and reballot
6055Reapproval of SEMI E27-0611, Guide for Mass Flow Controller and Mass Flow Meter Linearity
Failed, returned to the TF for rework and reballot
6056Reapproval of SEMI E28-1110, Guide for Pressure Specifications of the Mass Flow Controller
Failed, returned to the TF for rework and reballot
6057Reapproval of SEMI E29-1110, Terminology for the Calibration of Mass Flow Controllers and Mass Flow Meters
Passed, Superclean
6057ProceduralReview.pdf6057ProceduralReview.pdf
6058Reapproval of SEMI E66-0611, Test Method for Determining Particle Contribution by Mass Flow Controllers
Passed, Superclean
6058ProceduralReview.pdf6058ProceduralReview.pdf
6059Reapproval of SEMI F29-0997 (Reapproved 0611), Test Method for Purge Efficacy of Gas Source System Panels
Passed, Superclean
6059ProceduralReview.pdf6059ProceduralReview.pdf
6060Reapproval of SEMI F70-0611, Test Method for Determination of Particle Contribution of Gas Delivery System
Passed, Superclean
6060ProceduralReview.pdf6060ProceduralReview.pdf


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities

#
Type
SC/TF/WG
Details
6054ARevised SNARFMass Flow Controller TFLine Item Revisions to SEMI E18-0211, Guide for Temperature Specifications of the Mass Flow Controller – SNARF to be revised for Line Item changes
6055ARevised SNARFMass Flow Controller TFLine Item Revisions to SEMI E27-0611, Guide for Mass Flow Controller and Mass Flow Meter Linearity – SNARF to be revised for Line Item changes
6056ARevised SNARFMass Flow Controller TFRevision to SEMI E28-1110, Guide for Pressure Specifications of the Mass Flow Controller with title change to Guide for Pressure Parameters of the Mass Flow Controller – SNARF to be revised, distributed for two-week TC member review followed by GCS and re-ballot for Cycle 1-17
6111SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F6-92, Guide for Secondary Containment of Hazardous Gas Piping Systems – Five-year Review
6106SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F13-1101, Guide for Gas Source Control Equipment
– Five-year Review
6107SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F14-93 (Reapproved 0699), Guide for the Design of Gas Source Equipment Enclosures – Five-year Review
6108SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F20-0706E (Reapproved 0611), Specification for 316L Stainless Steel Bar, Forgings, Extruded Shapes, Plate, and Tubing for Components Used in General Purpose, High Purity and Ultra-High Purity Semiconductor Manufacturing Applications – Five-year Review
6110SNARFNA Facilities CommitteeReapproval of SEMI F4-0211, Specification for Pneumatically Actuated Cylinder Valves – Five-year Review
6109SNARFNA Facilities CommitteeReapproval of SEMI F32-0211, Test Method for Determining of Flow Coefficient for High Purity Shutoff Valves – Five-year Review
6123SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F81-0611, Specification for Visual Inspection and Acceptance of Gas Tungsten Arc (GTA) Welds in Fluid Distribution Systems in Semiconductor Manufacturing Applications – Five-year Review
6122SNARFMaterials of Construction of Gas Delivery Systems TFReapproval of SEMI F78-0611, Practice for Gas Tungsten Arc (GTA) Welding of Fluid Distribution Systems in Semiconductor Manufacturing Applications
– Five-year Review
6125SNARFGases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F23-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Flammable Specialty Gases – Five-year Review and to correct the nonconforming title
6126SNARFGases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F24-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Inert Specialty Gases –Five-year Review and to correct the nonconforming title
6127SNARFGases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F25-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Oxidant Specialty Gases – Five-year Review and to correct the nonconforming title
6128SNARFGases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F26-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Toxic Specialty Gases
– Five-year Review and to correct the nonconforming title
6121SNARFMass Flow Controller TFReapproval of SEMI E67-1011, Test Method for Determining Reliability of Mass Flow Controller – Five-year Review
6119SNARFMass Flow Controller TFRevision to SEMI E17-1011, Guide for Mass Flow Controller Transient Characteristics Tests with title change to Test Method for Measurement of Mass Flow Controller Transient Characteristics – SNARF to be distributed for two-week TC member review followed by GCS and re-ballot for Cycle 1-16
6120SNARFNA Facilities CommitteeReapproval of SEMI E137-0705 (Reapproved 1111), Guide for Final Assembly, Packaging, Transportation, Unpacking, and Relocation of Semiconductor Manufacturing Equipment – Five-year Review
6140SNARFGases Specification TFReapproval of SEMI C3.2-0611, Specification for Arsine (AsH3) in Cylinders, 99.94% Quality – Five-year Review
6138SNARFGases Specification TFReapproval of SEMI C3.27-1102 (Reapproved 1011), Specification for Boron Trifluoride (BF3) in Cylinders, 99.0% Quality – Five-year Review
6139SNARFGases Specification TFReapproval of SEMI C3.39-1011, Specification for Nitrogen Trifluoride (NF3), 99.98% – Five-year Review
6143SNARFGases Specification TFReapproval of SEMI C3.40-1011, Specification for Carbon Tetrafluoride (CF4), 99.997% Quality – Five-year Review
6141SNARFGases Specification TFReapproval of SEMI C3.47-1011, Specification for Hydrogen Bromide (HBr), 99.98% Quality – Five-year Review
6142SNARFGases Specification TFReapproval of SEMI C3.55-1011, Specification for Silane (SiH4), Bulk, 99.994% Quality – Five-year Review
6137SNARFGases Specification TFReapproval of SEMI C55-1104 (Reapproved 0211), Specification for Liquid Carbon Dioxide (CO2) Used in Near Critical, Critical and Supercritical Applications, >/ 99.99% Quality – Five-year Review
6105SNARFSEMI F51 Revision TFRevision to SEMI F51-1115, Guide for Elastometric Sealing Technology – SNARF was distributed for two-week TC member review followed by TC Chapter approval and will ballot for Cycle 1-17 or Cycle 2-17
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF

Authorized Ballots

#
When
SC/TF/WG
Details
R5816BCycle 9, 2016Filters & Purifiers TFRevision to SEMI F30-0710, Test Method for Verification of Purifier Performance Testing for Trace Gas Impurities and Particles at an Installation Site
R5997ACycle 9, 2016Gases Specification TFRevision to SEMI C3-0413, Specification for Gases
6054ACycle 9, 2016Mass Flow Controller TFLine Item Revisions to SEMI E18-0211, Guide for Temperature Specifications of the Mass Flow Controller
6055ACycle 9, 2016Mass Flow Controller TFLine Item Revisions to SEMI E27-0611, Guide for Mass Flow Controller and Mass Flow Meter Linearity
6056ACycle 1, 2017Mass Flow Controller TFRevision to SEMI E28-1110, Guide for Pressure Specifications of the Mass Flow Controller with title change to Guide for Pressure Parameters of the Mass Flow Controller
6111Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F6-92, Guide for Secondary Containment of Hazardous Gas Piping Systems
6106Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F13-1101, Guide for Gas Source Control Equipment
6107Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F14-93 (Reapproved 0699), Guide for the Design of Gas Source Equipment Enclosures
6108Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F20-0706E (Reapproved 0611), Specification for 316L Stainless Steel Bar, Forgings, Extruded Shapes, Plate, and Tubing for Components Used in General Purpose, High Purity and Ultra-High Purity Semiconductor Manufacturing Applications
6110Cycle 9, 2016NA Facilities CommitteeReapproval of SEMI F4-0211, Specification for Pneumatically Actuated Cylinder Valves
6109Cycle 9, 2016NA Facilities CommitteeReapproval of SEMI F32-0211, Test Method for Determining of Flow Coefficient for High Purity Shutoff Valves
6123Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F81-0611, Specification for Visual Inspection and Acceptance of Gas Tungsten Arc (GTA) Welds in Fluid Distribution Systems in Semiconductor Manufacturing Applications
6122Cycle 9, 2016Materials of Construction of Gas Delivery Systems TFReapproval of SEMI F78-0611, Practice for Gas Tungsten Arc (GTA) Welding of Fluid Distribution Systems in Semiconductor Manufacturing Applications
6125Cycle 1, 2017Gases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F23-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Flammable Specialty Gases
6126Cycle 1, 2017Gases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F24-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Inert Specialty Gases
6127Cycle 1, 2017Gases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F25-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Oxidant Specialty Gases
6128Cycle 1, 2017Gases Specification TFLine Item Revision to Correct Nonconforming Title of SEMI F26-0697 (Reapproved 0712), Particle Specification for Grade 10/0.2 Toxic Specialty Gases
6121Cycle 1, 2017Mass Flow Controller TFReapproval of SEMI E67-1011, Test Method for Determining Reliability of Mass Flow Controller
6119Cycle 1, 2017Mass Flow Controller TFRevision to SEMI E17-1011, Guide for Mass Flow Controller Transient Characteristics Tests with title change to Test Method for Measurement of Mass Flow Controller Transient Characteristics
6120Cycle 1, 2017NA Facilities CommitteeReapproval of SEMI E137-0705 (Reapproved 1111), Guide for Final Assembly, Packaging, Transportation, Unpacking, and Relocation of Semiconductor Manufacturing Equipment
6140Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.2-0611, Specification for Arsine (AsH3) in Cylinders, 99.94% Quality
6138Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.27-1102 (Reapproved 1011), Specification for Boron Trifluoride (BF3) in Cylinders, 99.0% Quality
6139Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.39-1011, Specification for Nitrogen Trifluoride (NF3), 99.98%
6143Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.40-1011, Specification for Carbon Tetrafluoride (CF4), 99.997% Quality
6141Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.47-1011, Specification for Hydrogen Bromide (HBr), 99.98% Quality
6142Cycle 2, 2017Gases Specification TFReapproval of SEMI C3.55-1011, Specification for Silane (SiH4), Bulk, 99.994% Quality
6137Cycle 2, 2017Gases Specification TFReapproval of SEMI C55-1104 (Reapproved 0211), Specification for Liquid Carbon Dioxide (CO2) Used in Near Critical, Critical and Supercritical Applications, >/ 99.99% Quality
6105Cycle 1 or 2, 2017SEMI F51 Revision TFRevision to SEMI F51-1115, Guide for Elastometric Sealing Technology


SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
Sent to Inactive Status:
SEMI F27-0997 (Reapproved 0611), Test Method for Moisture Interaction and Content of Gas Distribution Systems and Components by Atmospheric Pressure Ionization Mass Spectrometry (APIMS)

Special Announcements of the Committee (Workshops, Programs, etc.)
New Google site for collaboration, resources and important information for the NA Facilities & Gases Task forces and Committee. To edit or post, please email Laura Nguyen, lnguyen@semi.org, SEMI Staff, to be added.https://sites.google.com/a/semi.org/fg/

Next Meeting
https://sites.google.com/a/semi.org/fg/The next meeting of the Facilities & Gases NA TC Chapter committee is scheduled for Tuesday, April 4, 2017 at the NA Standards Spring 2017 Meetings at SEMI Headquarters.
For more information, please visit: 
http://www.semi.org/en/standards