SEMI International Standards
Standards Locale: North America |
Committee: Metrics |
Place of Meeting: SEMI Headqiarters in San Jose, California |
Date of Meeting: 04/01/2015 |
Meeting End Date: 04/01/2015 |
|
Recording SEMI Standards Staff: Michael Tran |
CER Posted to Web: 04/16/2015 |
Leadership Changes
None.
Committee Structure Changes
None.
Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting.
Document # | Document Title | TC Chapter Action | A&R Forms for Approved Ballots |
5819 | Reapproval with Editorial Revisions of SEMI E114-0302E (Reapproved 0309) - Test Method for RF Cable Assemblies Used in Semiconductor Processing Equipment RF Power Delivery Systems | Failed TC Chapter review | |
5820 | Reapproval with Editorial Revisions of SEMI E115-0302E (Reapproved 0309) - Test Method for Determining the Load Impedance and Efficiency of Matching Networks Used in Semiconductor Processing Equipment RF Power Delivery Systems | Failed TC Chapter review | |
5750 | Revision to Add a New Subordinate Standard: Specification for Product Time Measurement for Material Control Systems to SEMI E168-1114, Specification for Product Time Measurement | Passed TC Chapter review with editorial changes | 5750ProceduralReview.docx |
5751 | Revision to Add a New Subordinate Standard: Specification for Product Time Measurement for Transport Systems to SEMI E168-1114, Specification for Product Time Measurement
Ratification Ballot issued for Document 5751 per Regulations §10 (March 2015). Please see the A&R Procedural Review form for Document 5751 for details. | Passed TC Chapter review with technical and editorial changes. | 5751ProceduralReview.docx |
Ratification Ballot Results
None.
Activities Approved by the GCS between meetings of TC Chapter meeting
None.
Authorized Activities
None.
Authorized Ballots
None.
SNARF(s) Granted a One-Year Extension
None.
SNARF(s) Cancelled
None.
Standard(s) to receive Inactive Status
None.
Special Announcements of the Committee (Workshops, Programs, etc.)
SEMICON West 2015
July 14-16, 2015
Moscone Center, San Francisco
Register Today!
Next Meeting
The next N.A. Metrics standards meetings are tentatively scheduled for July 13 – 15, 2015 at the San Francisco Marriott Marquis Hotel in San Francisco, California in conjunction with the NA Standards Meetings at SEMICON West 2015. Exact meeting date and details will be announced when finalized and available at the SEMI Standards Calendar of Events: http://www.semi.org/en/Standards/CalendarEvents
*Tentative Schedule*
Monday, July 13*
-Wait Time Waste TF (3:00 PM - 6:00 PM)
Tuesday, July 14*
· Equipment T&D TF (9:00 AM – 12:00 PM Noon)
· EMC TF (5:00 PM – 7:00 PM)
Wednesday, July 15*
· Equipment RAMP Metrics TF (9:00 AM – 12:00 PM Noon)
· N.A. Metrics TC Chapter (2:00 PM – 5:00 PM)
*All times are in Pacific Time. Times and dates are subject to change without notice.
Copyright ©2024 Semiconductor Equipment and Materials International (SEMI®). All rights reserved.