SEMI
  HOME
SEMI International Standards
Standards Locale: North America
Committee: EHS
Place of Meeting: SEMI HQ, Milpitas, CA
Date of Meeting: 03/28/2024
Meeting End Date: 03/28/2024
Recording SEMI Standards Staff: Kevin Nguyen
CER Posted to Web: 04/09/2024


Leadership Changes
None.

Committee Structure Changes
None.

Ballot Results

Document #
Document Title
TC Chapter Action
A&R Forms for Approved Ballots
6980
Line Item Revisions to SEMI S2-0821Eb, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment (Delayed Revision Related to Flammable Substances) Refer below
Line Item 1 - Delayed Revision Related to Flammable Substances Passed with Technical Changes, Ratification Ballot to be issued.
7108ALine Item Revision to SEMI S2-0821Eb, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment (Delayed Revision Related to Safety Labels) Refer below7108 A&R Rev1.pdf7108 A&R Rev1.pdf
Line Item 1 - Delayed Revision Related to Safety Labels Passed with Technical Changes, Ratification Ballot to be issued.
7134Revision to SEMI S8-0218, Safety Guideline for Ergonomics Engineering of
Semiconductor Manufacturing Equipment
Failed and Returned to TF for rework
7158Line Item Revision to SEMI S2-0821Eb, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment (Delayed Revisions related to lifting equipment and
hinged loads (§§ 5.2, 18))
Refer below
Line Item 1 - Delayed Revisions related to lifting equipment and hinged loads (§§ 5.2, 18.6) Passed with Technical Changes, Ratification Ballot to be issued.
7159Reapproval of SEMI S25-0319, Safety Guideline for Hydrogen Peroxide Storage & Handling Systems Failed


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities
None.

Authorized Ballots
None.

SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled

#
TF
Title
6784Fire Protection Task ForceLine Item Revision to SEMI S2 Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment (Changes to materials of construction criterion in fire and smoke risk for pre-evaluation figure)


Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
None.

Next Meeting
July 11, 2024 9 AM - 3 PM at Moscone Center in San Francisco, CA in conjunction with SEMICON West. Check www.semi.org/standards for the latest update.











Copyright © 2008 Semiconductor Equipment and Materials International (SEMI®).
All rights reserved.