SEMI International Standards
Standards Locale: North America
Committee: 3D Packaging and Integration
Place of Meeting: Moscone Center, San Francisco, California/USA
Date of Meeting: 07/11/2019
Meeting End Date: 07/11/2019
Recording SEMI Standards Staff: Laura Nguyen
CER Posted to Web: 07/19/2019


Leadership Changes

WG/TF/SC/TC Name
Previous Leader
New Leader
3DP&I NA TC ChapterRich Allen (NIST)Bill Kerr (Evergreen Enhancement)
Fan-Out Panel Level Packaging (FO-PLP) Panel TFTimothy Kryman (Rudolph Technologies)


Committee Structure Changes
Previous WG/TF/SC Name
New WG/TF/SC Name or Status Change
Fan-Out Panel Level Packaging (FO-PLP) Panel TFPanel Level Packaging (PLP) Panel TF


Ballot Results

Document #
Document Title
Committee Action
A&R Forms for Approved Ballots
R6075ANew Standard: Guide for Describing Glass-Based Material for Use in 3DS-IC ProcessPassed, A&R Cycle 6-2019R6075A_Ballot Review_pass.pdfR6075A_Ballot Review_pass.pdf
R6332ANew Standard: Specification for Panel Substrate Characteristics for Panel Level Packaging (PLP) Applications, with title change to: Specification for Panel Characteristics for Panel Level Packaging (PLP) ApplicationsPassed, A&R Cycle 6-2019R6332A_Ballot Review_pass.pdfR6332A_Ballot Review_pass.pdf
6175BNew Standard: Guide on Measurements of Openings and Vias in GlassPassed, with editorial changes6175B_Ballot Review.pdf6175B_Ballot Review.pdf
6511Reapproval of SEMI 3D8-0514, Guide for Describing Silicon Wafers for Use as 300 mm Carrier Wafers in a 3DS-IC Temporary Bond-Debond (TBDB) ProcessFailed
6513Reapproval of SEMI G83-0912, Specification for Bar Code Marking of Product PackagesFailed
Note 1: Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Note 2:
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting or abandoning.


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities
Listing of all revised or new SNARF(s) approved by the Originating TC Chapter.
#
Type
SC/TF/WG
Details
-
TFOFPLP Panel TFPanel Level Packaging (PLP) Panel TF
– Revision to TFOF: update TF name, charter and scope
6555SNARFNA 3DP&I CommitteeReapproval of SEMI 3D9-0914, Guide for Describing Materials Properties for a 300 mm 3DS-IC Wafer Stack
– Authorized new SNARF
6556SNARFNA 3DP&I CommitteeReapproval of SEMI 3D10-0814, Guide to Describing Materials Properties for Intermediate Wafers for Use in a 300 mm 3DS-IC Wafer Stack
– Authorized new SNARF
6557SNARFNA 3DP&I CommitteeReapproval of SEMI 3D11-1214, Terminology for Through Glass Via and Blind Via in Glass Geometrical Metrology
– Authorized new SNARF
6558SNARFNA 3DP&I CommitteeReapproval of SEMI 3D12-0315, Guide for Measuring Flatness and Shape of Low Stiffness Wafers
– Authorized new SNARF
Note 1: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF


Authorized Ballots
Listing of documents authorized by the Originating TC Chapter for Letter Ballot.
#
When
TF
Details
6555Cycle 6-2019NA 3DP&I CommitteeReapproval of SEMI 3D9-0914, Guide for Describing Materials Properties for a 300 mm 3DS-IC Wafer Stack
6556Cycle 6-2019NA 3DP&I CommitteeReapproval of SEMI 3D10-0814, Guide to Describing Materials Properties for Intermediate Wafers for Use in a 300 mm 3DS-IC Wafer Stack
6557Cycle 6-2019NA 3DP&I CommitteeReapproval of SEMI 3D11-1214, Terminology for Through Glass Via and Blind Via in Glass Geometrical Metrology
6558Cycle 6-2019NA 3DP&I CommitteeReapproval of SEMI 3D12-0315, Guide for Measuring Flatness and Shape of Low Stiffness Wafers


SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
None.

Next Meeting

The next meeting is scheduled for Thursday, November 7, in conjunction with the NA Standards Fall 2019 Meetings at SEMI Headquarters in Milpitas, California. For more information, please visit the Standards Calendar at http://www.semi.org/standards.

Tentative Schedule:

        Thursday, November 7
          11:00-12:00 Joint 3DP&I Bonded Wafer Stacks (TF) and 3DP&I Inspection and Metrology (TF)
          13:00-14:00 PLP Panel (TF)
          14:00-16:00 TBD 3DP&I (C)
      Note: Alternative to move to Wednesday AM