SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 07/25/2017Revised (if Applicable):

Document Number: 6295
SNARF for: New Standard: Test Method for Extension of Flexible Thin Film PV Modules

Originating Global Technical Committee: Photovoltaic
Originating TC Chapter: China
Task Force (TF) in which work is to be carried out: Thin Film PV Module Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
The flexible thin film PV modules have received considerable attention due to its potential applications in real life. A typical stretching situation is given during the mounting phase when the flexible PV modules is installed into the final position. The installation staff will pull the components when the PV modules are laid because the flexible modules are transported in rolls. Since the PV modules can be installed on different bases, the extension durability need to be qualified to avoid the damage of PV modules. When the flexible modules are mounted on a soft base, encountering wind and snow, the part of PV module will be stretched. Additionally, the flexible modules in the reused situation need move freely that will lead to be stretched. IEC61215 is the current dominant standard for thin-film PV modules. However, it doesn’t describe extension test for flexible thin film PV modules. Given to the uniqueness of the flexible thin film PV modules, it is vital to evaluate the extension durability for application. In order to ensure an accurate module stabilized output power value after a certain extension test, a new standard specific to flexible thin film solar modules needs to be established.


b. Estimate effect on industry.
2: Major effect on an industry sector - identify the relevant sector
Sector or Company Information: Module manufactory, testing organization

c. Estimate technical difficulty of the activity.
II: Some Difficulty - Disagreements on known requirements exist but developing consensus is possible

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
1. The standard describes extension procedures for the measurement of flexible thin film PV module.
2. This procedure is applicable for flexible thin film PV modules.


b: Expected result of activity
New Standard or Safety Guideline (including replacement of an existing Standard or Safety Guideline)

For a new Subordinate Standard, identify the Primary Standard here:




For Standards, identify the Standard Subtype below:
Test Method

Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 10/01/2017b. 1st Draft by: 10/01/2018
c. (Optional) Informational Ballot by: d. Letter Ballot by: 07/01/2019
e. TC Chapter Approval By:10/01/2019

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)
Japan PV Materials Task Force
Int’l Analytical Test Methods, Metrology, and Inspection Task Force

b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will be issued – identify the recipient global technical committee(s):

Identify the recipient global technical committee(s):
Photovoltaic (PV) - Materials
___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
the use of patented technology is NOT required.

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):
there is no known material patented technology necessary to use or implement the Standard(s) and Safety Guideline(s)

c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:
took place between (put dates below ) before approval at the TC Chapter Meeting, or

Member Review Start Date; 2017/8/31
Member Review End Date: 2017/9/14

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS10/13/2017
Recorded in TC Minutes11/12/2017

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on