SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 03/31/2014Revised (if Applicable):

Document Number: 5716
SNARF for: Revisions to SEMI E133, Specification for Automated Process Control Systems Interface and SEMI E133.1, Provisional Specification for XML Messaging for Process Control Systems (PCS)

Originating Global Technical Committee: Information & Control
Originating TC Chapter: North America
Task Force (TF) in which work is to be carried out: Process Control System NA
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
Adjustments are needed to existing E133 and E133.1 standards content to better align with the XML guidelines document, as necessary. Technical changes are needed to clarify the implementation of the PCS analysis engine type.

SEMI E133.1 still contain the term “Provisional” that is no longer used in SEMI Standards.



b. Estimate effect on industry.
2: Major effect on an industry sector - identify the relevant sector
Sector or Company Information: automation

c. Estimate technical difficulty of the activity.
II: Some Difficulty - Disagreements on known requirements exist but developing consensus is possible

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
This ballot will be a major revision to E133 and E133.1.

This ballot will propose the following changes:
- Enhancements to E133.1 (XML specification). Adjustments will be made to existing E133 and E133.1 standards content to better align with the XML guidelines document, as necessary. Technical changes will be made to clarify the implementation of the PCS analysis engine type.
- Changes to the schema
- Removal of “Provisional”

Some of the changes listed above will also require related/corresponding changes in the E133 primary standard.


b: Expected result of activity
Major revision to an existing Standard or Safety Guideline

For a new Subordinate Standard, identify the Primary Standard here:




For Standards, identify the Standard Subtype below:


Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 03/31/2014b. 1st Draft by:
c. (Optional) Informational Ballot by: d. Letter Ballot by: 05/01/2014
e. TC Chapter Approval By:07/01/2014

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)
Diagnostic Data Acquisition (DDA) Task Force

Intercommittee Ballots will NOT be issued.

b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:


Identify the recipient global technical committee(s):

___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:


If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):


c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:


Member Review Start Date; None.
Member Review End Date: None.

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS04/02/2014
Recorded in TC Minutes04/02/2014

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on 11/08/2016
Extension Expires on03/31/2018