SEMI International Standards
TASK FORCE ORGANIZATION FORM (TFOF)
Date Prepared: 09/25/2009Revised (if Applicable):

Name of Task Force (TF): PV Transport Carrier Task Force

Global Technical Committee: Photovoltaic (PV) - Automation
Originating Technical Committee Region: Europe


_____________________________________________________________________________
1. Charter: (State the objective of the proposed TF.)
Develop/define standard(s) for unified transport entities (boxes, cassettes, carriers) for production systems of the Photovoltaic (PV) industry.

Standardizing of transport entities it is expected to:

- Reduce efforts on equipment supplier as well as on PV-manufacturer side caused by the need to specify, maintain and operate proprietary transport entities, load port, AMHS…
- Reduce the cost for automated material handling
- Enable higher yield
- Speed up the factory integration and ramp up processes

_____________________________________________________________________________
2. Scope: (Define the specific activities that the TF will conduct.)
Develop one or more standard(s) specifying transport entities for crystalline PV-wafer and PV-cell up to 156mm by 156mm. The taskforce will evaluate the industry requirements with regard to transportation of material within PV manufacturing lines, evaluate existing standards and either adjust existing standards to be used in PV manufacturing or develop new standards to support these requirements.

The taskforce assumes that at least 3 different transport entities have to be standardized:

1. Transport box
2. Transport box (with belts)
3. Transport carrier

The taskforce plans, based on the gathered requirements, to specify the following topics:

1. Mechanical interface to equipment load port (ground plate)
2. Material handling interface
3. Mechanical interface to transport system (manual (e.g. PGV) or automated (e.g. Conveyer belt))
4. ID System requirements
5. Adapters to handle smaller wafer sizes

_____________________________________________________________________________
3. Formal linkages with TFs in other Regions/Locales: (Show each associated TF and its parent global technical committee; indicate nature of relationship – global TF, observer TF, etc.)
North America – PV Carrier TF
Japan – PV EIS TF
Europe – PV EIS TF
North America – PV Materials TF
Taiwan – PV EIS Coordination WG

_____________________________________________________________________________
4. Formation Date:(TF formed on)

Task Force formed on: 09/22/2009
Task Force approved by Committee/GCS on: 09/22/2009