SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 07/13/2023Revised (if Applicable):

Document Number: 7133
SNARF for: Revision of SEMI S6-0618 - Environmental, Health, and Safety Guideline for Exhaust Ventilation of Semiconductor Manufacturing Equipment


Originating Global Technical Committee: EH&S
Originating TC Chapter: North America
Task Force (TF) in which work is to be carried out: S6 Revision Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
Doc 7023, the Reapproval Ballot for SEMI S6 has been found by the NA EHS TCC to have failed.
The ballot received 103 Negatives related to technical matters and approximately 120 items in need of editorial correction.
The technical matters are distributed widely throughout SEMI S6.
The number of items far exceeds the 10 Line Item limit and the TF does not see adequate value in grouping the items to conform to the Line Item limit.



b. Estimate effect on industry.
2: Major effect on an industry sector - identify the relevant sector
Sector or Company Information: Manufacturers and users of SME that relies on exhaust ventilation to mitigate risk.

c. Estimate technical difficulty of the activity.
III: Difficult - Limited expertise and resources exist and/or achieving consensus is difficult

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
Exhaust ventilation used to mitigate risk

b: Expected result of activity
Major revision to an existing Standard or Safety Guideline

For a new Subordinate Standard, identify the Primary Standard here:


Modification of an existing part of Standard(s) or Safety Guideline(s) including Appendices, Complementary Files, and Supplementary Materials, Addition of one or more Appendices or Complementary Files to an existing Standard or Safety Guideline, Addition of one or more Related Information sections or Various Materials to an existing Standard or Safety Guideline

For Standards, identify the Standard Subtype below:


Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 07/01/2023b. 1st Draft by: 11/01/2023
c. (Optional) Informational Ballot by: d. Letter Ballot by: 12/01/2023
e. TC Chapter Approval By:04/01/2024

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)


b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will be issued – identify the recipient global technical committee(s):

Identify the recipient global technical committee(s):
Facilities
___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
the use of patented technology is NOT required.

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):
there is no known material patented technology necessary to use or implement the Standard(s) and Safety Guideline(s)

c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
the incorporation of Copyrighted Item will NOT be required



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:
took place between (put dates below) before approval by the GCS, or

Member Review Start Date; 07/17/2023
Member Review End Date: 07/31/2023.

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS08/11/2023
Recorded in TC Minutes

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on