Activity Number: 5566
SNARF for: Line Item Revision to SEMI PV002-00-0709E Guide for PV Equipment Communication Interfaces (PVECI), modify requirement [PV02-RQ-00007-00] to allow implementation of new namelist requests instead of required documentation.


Originating Global Technical Committee: Automation Technology
Originating Technical Committee Region: Europe
Task Force in which work is to be carried out: Photovoltaic – Equipment Interface Specification (PV-EIS)


1. Rationale: SEMI E30 contains 2 new message pairs to query the DV and CEID information and their relationships. With this modification in SEMI E30, these new message pairs are automatically ‘additional capabilities’ for SEMI PV02. Suppliers who implement these new namelist requests are not required to provide DV and CEID documentation as described in requirement [PV02-RQ-00007-00].
Rate the Estimated Effect on the Industry
1: Major effect on entire industry or on multiple important industry sectors

Rate the Estimated Technical Difficulty of the Activity
I: No Difficulty - Proven concepts and techniques exist or quick agreement anticipated

2. Scope:
a: Define the areas to be covered or addressed by this activity or document:
The requirement [PV02-RQ-00007-00] will be reworded.

b: Expected result of activity
Revision to an existing Standard/Guideline

3. Projected Timetable for Completion:
a: General Milestones
a. Activity Start: 03/01/2013b. 1st Draft by: 03/01/2013
c. Preballot by: d. Technical Ballot by: 03/01/2013
e. Committee Approval By:10/01/2013




Safety Considerations:
The resulting document is expected NOT to be a Safety Guideline


Intellectual Property Considerations:
a. In complying with the standard or safety guideline to be developed, the use of patented technology or a copyrighted item(s) is NOT required
b. The body of the standard and any appendices or related information sections will NOT include copyrighted material

Comments, Special Circumstances: None.

Approval: Activity approved by Committee/GCS on March 1, 2013