SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 11/24/2020Revised (if Applicable):

Document Number: 6714
SNARF for: Line Item Revision to SEMI C93-0620, Guide for Determining the Quality of Ion Exchange Resin Used in Polish Applications of Ultrapure Water System

Originating Global Technical Committee: Liquid Chemicals
Originating TC Chapter: North America
Task Force (TF) in which work is to be carried out: Ultra Pure Water Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
Ion exchange resins are a known source of particles and particle precursors in ultrapure water. These particles and particle precursors can be difficult to remove by filtration. Requirements for particles continue to become more stringent and the concern for particle precursors has elevated based on results of recent particle deposition studies. This specification provides guidance on how to measure particle contamination released from the resin during installation and rinse-down.
The current revision of the specification needs to be updated to correct discovered errors and clarification of some procedural steps.



b. Estimate effect on industry.
2: Major effect on an industry sector - identify the relevant sector
Sector or Company Information: Ultrapure Water Systems of advanced microelectronic manufacturing Facilities

c. Estimate technical difficulty of the activity.
I: No Difficulty - Proven concepts and techniques exist or quick agreement is anticipated

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
Review document based on applications experiences and recommend line item changes to the document. The changes are going to focus on metrology capabilities to detect particles and particle precursors leaching off of the ion exchange resin.

b: Expected result of activity
Line-item revision to an existing Standard or Safety Guideline

For a new Subordinate Standard, identify the Primary Standard here:


Modification of an existing part of Standard(s) or Safety Guideline(s) including Appendices, Complementary Files, and Supplementary Materials

For Standards, identify the Standard Subtype below:
Guide

Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 01/01/2021b. 1st Draft by: 04/01/2021
c. (Optional) Informational Ballot by: d. Letter Ballot by: 07/01/2021
e. TC Chapter Approval By:09/01/2021

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)


b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will be issued – identify the recipient global technical committee(s):

Identify the recipient global technical committee(s):
Facilities
___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:


If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):
there is no known material patented technology necessary to use or implement the Standard(s) and Safety Guideline(s)

c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
the incorporation of Copyrighted Item will NOT be required



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
L1-10:
Passed A&R Cycle: 11-2021

Publishing Cycle: 0522


__________________________________________________________________________
8. TC Member Review:
is not required for this SNARF.

Member Review Start Date; None.
Member Review End Date: None.

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS01/22/2021
Recorded in TC Minutes

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on
SNARF_C93 (LI).pdfSNARF_C93 (LI).pdfSNARF_2020_SEMI C93 R2_LNN.docSNARF_2020_SEMI C93 R2_LNN.doc