SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 10/07/2015Revised (if Applicable):

Document Number: 5893
SNARF for: Revision of SEMI M1-0215 Specifications for Polished Single Crystal Silicon Wafers

Originating Global Technical Committee: Silicon Wafer
Originating TC Chapter: North America
Task Force (TF) in which work is to be carried out: International Polished Wafers Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
This revision of SEMI M1 is intended primarily to remove the listing of wafer categories in the Scope section so that modifications of this listing can be made with line item ballots and other items to bring the standard up to date.


b. Estimate effect on industry.
4: Slight effect or effect not determinable
Sector or Company Information:

c. Estimate technical difficulty of the activity.
I: No Difficulty - Proven concepts and techniques exist or quick agreement is anticipated

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
In addition to the removal of the category list from the scope of the standard, the following items are included in this ballot:
1. wafer category 1.15 that is no longer used in the industry is removed,
2. the figures describing notchless wafers are modified to show the 1.5 mm edge exclusion associated with those wafers, and incorporate some corrections discussed during SEMICON West.
3. §3, Table 1, Table R1-1, and ¶R3-8.1 of SEMI M1, are modified as needed, to add reference to SEMI M85 to update references to the test methods for surface chemistry of polished electronic grade silicon wafers. The last changes are needed because (1) the ICP-MS technique has been recently standardized and (2) there are some rather minor corrections to the recently balloted table that were not noted on the ballot.
4. Correct “Specifications” to “Specification” for title conformance
5. Reference to MF534 and MF657 removed throughout.


b: Expected result of activity
Major revision to an existing Standard or Safety Guideline

For a new Subordinate Standard, identify the Primary Standard here:


Modification of an existing part of Standard(s) or Safety Guideline(s) including Appendices, Complementary Files, and Supplementary Materials

For Standards, identify the Standard Subtype below:
Specification

Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 07/01/2015b. 1st Draft by: 07/01/2015
c. (Optional) Informational Ballot by: d. Letter Ballot by: 10/01/2015
e. TC Chapter Approval By:12/01/2015

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)
Global Traceability Committee

b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will be issued – identify the recipient global technical committee(s):

Identify the recipient global technical committee(s):
Traceability
___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
the use of patented technology is NOT required.

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):
there is no known material patented technology necessary to use or implement the Standard(s) and Safety Guideline(s)

c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
will NOT include reproduced copyrighted material



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
Original SNARF approved (following two-week review) 7/13/2015.

__________________________________________________________________________
8. TC Member Review:
is not required for this SNARF.

Member Review Start Date; 6/1/2015
Member Review End Date: 6/15/2015None.

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS10/07/2015
Recorded in TC Minutes

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on