TFOF for S2/S22 Task Force
SEMI International Standards
TASK FORCE ORGANIZATION FORM (TFOF)
Date Prepared: 10/18/2001
Revised (if Applicable): 11/11/2010

Name of Task Force (TF): S2/S22 Task Force

Global Technical Committee: EH&S
Originating Technical Committee Region: North America


_____________________________________________________________________________
1. Charter: (State the objective of the proposed TF.)
The task force will maintain S22 and the electrical and safety circuit content of S2 intending to do this through line item revisions to both documents, possibly through delayed revision methodology.
_____________________________________________________________________________
2. Scope: (Define the specific activities that the TF will conduct.)
The task force will maintain the electrical and safety circuit criteria in S2 and the S22 document.
_____________________________________________________________________________
3. Formal linkages with TFs in other Regions/Locales: (Show each associated TF and its parent global technical committee; indicate nature of relationship – global TF, observer TF, etc.)
MESSC
_____________________________________________________________________________
4. Formation Date:(TF formed on)

Task Force formed on: 10/18/2001
Task Force approved by Committee/GCS on:

5. Comments
None.