SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 07/27/2015Revised (if Applicable):

Document Number: 5977
SNARF for: New Standard, Test Method for Water Vapor Barrier Property for Plastic Films with High Barrier for Electronic Devices

Originating Global Technical Committee: Flat Panel Display (FPD) - Materials & Components
Originating TC Chapter: Japan
Task Force (TF) in which work is to be carried out: Flexible Display Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
There are no effective test methods while plastic films with high barrier properties are currently in the focus for flexible application in an increasing number of technical fields such as barrier films for electronic devices such as flexible displays.

Note, ISO 15106 Part7
The increase area value of the defect per unit time. → Transmission rate of water vapor

SEMI
1. The number of defects per unit area.
2. Time that defects begin increase. (Especially, multilayer gas barrier film) → Measurement of defects



b. Estimate effect on industry.
1: Major effect on entire industry or on multiple important industry sectors - identify the relevant sectors
Sector or Company Information:

c. Estimate technical difficulty of the activity.
III: Difficult - Limited expertise and resources exist and/or achieving consensus is difficult

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
1. Determination of water vapor barrier Property of the plastic films used to flexible electronics devices such as flexible displays.
2. The test methods are adapted for the plastic films which water vapor transmission rate is the range of 10-3 - 10-6 g/m2 ・d.


b: Expected result of activity
New Standard or Safety Guideline (including replacement of an existing Standard or Safety Guideline)

For a new Subordinate Standard, identify the Primary Standard here:




For Standards, identify the Standard Subtype below:
Test Method

Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 10/01/2015b. 1st Draft by: 10/01/2016
c. (Optional) Informational Ballot by: 12/01/2016d. Letter Ballot by: 04/01/2017
e. TC Chapter Approval By:10/01/2017

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)
Taiwan FPD Committee Flexible TF

b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will not be issued

Identify the recipient global technical committee(s):

___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s).

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:
Letter of Intent received

b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):


c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
will NOT include reproduced copyrighted material



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:
took place between (put dates below ) before approval at the TC Chapter Meeting, or

Member Review Start Date; 10/15/2015
Member Review End Date: 10/29/2015

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS11/11/2015
Recorded in TC Minutes11/11/2015

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on