SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 06/30/2022Revised (if Applicable):

Document Number: 6976
SNARF for: Revision to SEMI D71-0614, Test Method of PDP Tone and Color Reproduction with Title Change to: Test Method of Tone and Color Reproduction For Flat Panel Displays

Originating Global Technical Committee: Flat Panel Display (FPD) - Metrology
Originating TC Chapter: Korea
Task Force (TF) in which work is to be carried out: Picture Quality Evaluation Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)


D71, Test Method of PDP Tone and Color Reproduction limits the application to PDP (Plasma Display Panel) products. But PDP is not an FPD product being produced anymore. Therefore, it is necessary to update the document’s scope to follow the current technology trends. In this major revision, the items to be changed are as follows.

1. Title: Test Method of Tone and Color Reproduction for Flat Panel Displays
2. Update Reference Standards and Documents according to the new title
3. Update test patterns and equations to harmonize with other SEMI FPD standards (D076-00-0318 and D082-00-0821)
4. Editorial changes to the test method and related data

Through the revision of these items, it is expected that the test method oftone and color reproductionfor contemporary FPDwill be reflected,and some equations will be updatedto provide customers with tone and color reproductionaccuracy.



b. Estimate effect on industry.
1: Major effect on entire industry or on multiple important industry sectors - identify the relevant sectors
Sector or Company Information: FPD panel manufacturing companies and FPD panel purchasing companies

c. Estimate technical difficulty of the activity.
I: No Difficulty - Proven concepts and techniques exist or quick agreement is anticipated

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:

To revise the title and update the test patterns and related equations.

1. Title:
Revise to “Test Method of Tone and Color Reproduction for Flat Panel Display” from “Test Method of PDP Tone and Color Reproduction”

2. Update Reference Standards and Documents according to the new title

3. Test patterns
Update color reference patterns to harmonize with the other SEMI FPD standards (D076-00-0318 and D082-00-0821)

4. Equations
Update equations related to chromaticity difference and color difference

5. Sentences
Update with editorial changes of the test method and related data


b: Expected result of activity
Major revision to an existing Standard or Safety Guideline

For a new Subordinate Standard, identify the Primary Standard here:


Modification of an existing part of Standard(s) or Safety Guideline(s) including Appendices, Complementary Files, and Supplementary Materials

For Standards, identify the Standard Subtype below:
Test Method

Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 09/08/2022b. 1st Draft by: 10/04/2022
c. (Optional) Informational Ballot by: d. Letter Ballot by: 10/18/2022
e. TC Chapter Approval By:09/30/2023

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)
All FPD Metrology TC Chapters

b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will not be issued

Identify the recipient global technical committee(s):
Flat Panel Display (FPD) - Metrology
___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
the use of patented technology is NOT required.

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):
there is no known material patented technology necessary to use or implement the Standard(s) and Safety Guideline(s)

c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
the incorporation of Copyrighted Item will NOT be required



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:
took place between (put dates below) before approval by the GCS, or

Member Review Start Date; 08/16/2022
Member Review End Date: 08/30/2022

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS09/08/2022
Recorded in TC Minutes

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on
SNARF_XXXX_RevToD71_v2.pdfSNARF_XXXX_RevToD71_v2.pdf