· Determine if guidance is useful for WKN for the implementation specific collection events used for collection event E142SubstrateMapDataReady placeholder referred to in SEMI E142.4 (to notify he host when substrate map data is ready). E142SubstrateMapDataReady is a placeholder name for collection events that the implementation designates for this purpose (which may already have WKN defined by other SEMI Standards). For implementation specific events, it may be useful to have a consistent way to identify the events for this purpose.
Any other changes to address features or defects, or issues with the Style Guide raised by Task Force members during the development and review of the proposed changes related to these line item topics. Significant changes in scope still require a SNARF revision in compliance with SEMI Regulations. b: Expected result of activity Line-item revision to two or more existing Standards or Safety Guidelines For a new Subordinate Standard, identify the Primary Standard here: Modification of an existing part of Standard(s) or Safety Guideline(s) including Appendices, Complementary Files, and Supplementary Materials, Addition of one or more Appendices or Complementary Files to an existing Standard or Safety Guideline, Addition of one or more Related Information sections or Various Materials to an existing Standard or Safety Guideline, Revision or addition of one or more Subordinate Standards to an existing Primary Standard For Standards, identify the Standard Subtype below: Specification Miscellaneous (describe below): ___________________________________________________________________________ 3. Projected Timetable for Completion: a: General Milestones
10. SNARF Extension Dates: