SEMI International Standards
Standards New Activity Report Form (SNARF)
Date Prepared: 02/11/2026Revised (if Applicable):

Document Number: 7467
SNARF for: New Auxiliary Information Document Comparing and Contrasting SEMI C79, C82 and C89

Originating Global Technical Committee: Liquid Chemicals
Originating TC Chapter: North America
Task Force (TF) in which work is to be carried out: Ultra Pure Water Task Force
Note: If a new task force is needed, also submit a task force organization form (TFOF)

___________________________________________________________________________
1. Rationale:
a. Describe the need or problem addressed by this activity.
(Indicate the customer, what benefits they will receive, and if possible, quantify the impact on the return on investment [ROI] if the Document is implemented.)
There are currently three SEMI Standards (SEMI C79, C82, and C89) related to filter retention measurement with overlapping particle size ranges. Testing of the same filter type using these different methods has been shown to yield different retention measurements depending on the method used. This creates difficulty for end users in determining which test method is appropriate for their application. All three methods have support within the industry, and elimination of any specification has met resistance.

The purpose of this document is to provide the industry with a reference outlining the differences between the methods, the strengths and weaknesses of each, and guidance on selecting the appropriate specification for a given application.



b. Estimate effect on industry.
4: Slight effect or effect not determinable
Sector or Company Information:

c. Estimate technical difficulty of the activity.
II: Some Difficulty - Disagreements on known requirements exist but developing consensus is possible

___________________________________________________________________________
2. Scope:
a: Describe the technical areas to be covered or addressed by this Document development activity. For Subordinate Standards, list common concepts or criteria that the Subordinate Standard inherits from the Primary Standard, as well as differences from the Primary Standard:
A sub-team of the SEMI UPW TF will prepare the document with the following outline:
--Introduction
-End users drive IRDS roadmap which drives the particle size range and test standards
-Importance of filter tests
-Problem statement / three test methods
-Purpose: clarify
--Overview of SEMI test methods
-Comparison of test methods and recommendations
-Know gaps between the test method and “real-world” application.
-Guidance on when to use which specification.
--Conclusions
--References
--Appendix (limit scope to the three standards)
-Type of media
-Filter designs
-Retention mechanisms

A draft of the documents will be prepared for the SEMI Japan TF to review before releasing for publication.

b: Expected result of activity
New Auxiliary Information

For a new Subordinate Standard, identify the Primary Standard here:




For Standards, identify the Standard Subtype below:


Miscellaneous (describe below):

___________________________________________________________________________
3. Projected Timetable for Completion:

a: General Milestones
a. Activity Start: 02/28/2026b. 1st Draft by: 03/01/2026
c. (Optional) Informational Ballot by: d. Letter Ballot by: 04/10/2026
e. TC Chapter Approval By:05/10/2026

_____________________________________________________________________________
4. Liaisons with other Global Technical Committees/TC Chapters/Subcommittees/TFs:
a.
List SEMI global technical committees, TC Chapters, subcommittees, or task forces in your or other Regions/Locales that should be kept informed regarding the progress of this activity. (Refer to SEMI Standards organization charts and global technical committee charters and scopes as needed.)


b. List any planned Type I Liaisons with external nonprofit organizations (e.g., SDO) that should receive Draft Documents from Standards staff for feedback during this activity and be notified when the Letter Ballot is issued (refer to Procedure Manual § 7):


c. Intercommittee Ballots:
will not be issued

Identify the recipient global technical committee(s):

___________________________________________________________________________
5. Safety Considerations:
The resulting document is expected:
NOT to be a Safety Guideline

NOTE FOR "to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is NOT technically sound and complete - Refer to Section 15.1 of the Regulations for special procedures to be followed.

NOTE FOR "NOT to be a Safety Guideline": When all safety-related information is removed from the Document, the Document is still technically sound and complete.

___________________________________________________________________________
6. Intellectual Property Considerations:
Note: Both a: and b: below should be checked for Revision of existing Standard(s) and Safety Guideline(s).

a. For a new Standard or Safety Guideline and for any part to be modified or added in a Revision of published Standards and Safety Guidelines:
the use of patented technology is NOT required.

If "patented technology is intended to be included in the proposed Standard(s) or Safety Guideline(s) " is selected above, then also check one:


b. For Revision, Reapproval, Reinstatement, or Withdrawal of existing Standard(s) and Safety Guideline(s):


c. The body of the Document and any Appendices, Complementary Files, Related Information sections, or Various Materials that may or may not be a part of the Document by reference:
the incorporation of Copyrighted Item will NOT be required



NOTE FORthe use of patented technology or the incorporation of Copyrighted Item(s) is NOT required’: If in the course of developing the Document, it is determined that the use of patented technology or Copyrighted Item(s) is necessary for the Document, the provisions of Regulations § 16 must be followed.

NOTE FORwill incorporate Copyrighted Item’: A copyright release letter must be obtained from the copyright owner prior to publication.

___________________________________________________________________________
7. Comments, Special Circumstances:
None.

__________________________________________________________________________
8. TC Member Review:
is not required for this SNARF.

Member Review Start Date; None.
Member Review End Date: None.

NOTE FOR ‘TC Member Review’ is required by the Regulations for a period of at least two weeks
before approval of a new, or a major revision of an existing, Standard or Safety Guideline. (Refer to Regulations ¶ 8.2.1)
__________________________________________________________________________

9. SNARF Approval Dates:
TC Chapter or GCS04/07/2026
Recorded in TC Minutes

__________________________________________________________________________

10. SNARF Extension Dates:
TC Chapter Extension Granted on
Extension Expires on